C2-Lomié

  • Construction of a new raw water intake, installation of raw water pumps and laying of a 100m HDPE OD 160 raw water main
  • Construction of a new water treatment plant (60 m³/h) equipped with a concrete decanter and a self cleaning filter.
  • Construction of a 130 m³ concrete tank
  • Construction of the pump room and installation of the treated water pumps
  • Laying of a 3,400 m HDPE OD 160 treated water main
  • Construction of a 500 m³ reservoir
  • Construction of a 3,200 m MV electrical line and installation of a160 kVA transformer
  • Densification of the distribution network with laying of 6,150 m HDPE OD 160 and 1,850 m HDPE OD 200 pipes
  • Construction of the operator’s office.

  • Date Started: 2018-07-01
  • Date Completed:2019-09-27
  • Location: Cameroon
  • Category: Construction
  • Tag: Construction