C2-Dimako

admin/uploads/blog/3c1f134742326c714ebb747a737e210c.jpg3ad084e7887bcceb0d4ca548aee3784c.jpg
admin/uploads/blog/3c1f134742326c714ebb747a737e210c.jpg

C2-Dimako

  • Construction of a new raw water intake, installation of raw water pumps and laying of a 150 m HDPE OD 110 raw water main
  • Construction of a treatment plant in concrete (30 m³/h)
  • Construction of a 70 m³ treated water slab
  • Construction of the pump room and installation of the treated water pumping
  • Laying of a 2,000 m HDPE OD 110 treated water main
  • Construction of a 300 m³ elevated tank
  • Construction of a 1,000 m MV electrical line and installation of a100 kVA transformer
  • Densification of the distribution network with laying of 3,000 m HDPE OD 160 and 5,000 m HDPE OD 110 pipes
  • Construction of the operator’s office.

  • Date Started: 2018-04-01
  • Date Completed:2019-09-23
  • Location: Cameroon
  • Category: Construction
  • Tag: Construction