C2-Djoum

admin/uploads/blog/c141757742572e02776d48add63089bf.jpg

C2-Djoum

  • Construction of 4 boreholes (8 to 10 m³/h)
  • Installation of treatment units (disinfection)
  • Construction of technical buildings
  • Construction of a 1,500 m MV electrical line and installation of a 100 kVA transformer.
  • Laying of a 2,750 m HDPE OD 160 treated water main
  • Rehabilitation of the 2 existing elevated tanks
  • Densification of the distribution network with laying of 4,520m HDPE OD 160 and 3,480m HDPE OD 110 pipes
  • Construction of the operator’s office.

  • Date Started: 2019-07-01
  • Date Completed:Ongoing Project
  • Location: Cameroon
  • Category: Rehabilitation
  • Tag: Rehabilitation