T1-Douala Ndogbong

admin/uploads/blog/8a6fd6b233e5984b486e732c92018052.jpg

T1-Douala Ndogbong

  • Design and rehabilitation of a pumping station 2550m3/h, Installation of 3 vertical pumps of 850m3/h at 3.3bar each, Replacement of all pipework and hydro-mechanical equipment, Installation of an MT substation including a 630 KVA transformer, Replacement of MCC panels, Installation of Intelligent Condition Monitoring systems, and Installation of water disinfection system.

  • Date Started: 2011-05-01
  • Date Completed:2012-07-01
  • Location: Cameroon
  • Category: Construction
  • Tag: