T2-Buea

  • Construction of a river weir;
  • Construction of a raw water pumping station, 1 + 1 pumps, 220 m3/h at 110 m
  • Construction and laying of a 3 km HDPE main pipe OD 355 – SDR 11
  • Rehabilitation of the Mosel Spring treatment station and extension of its production capacity (150 m³/h to 370 m³/h)
  • Rehabilitation of the treated water pumping station (1 + 1 pumps, 115 m3/h at 150 m)

  • Date Started: 2012-05-01
  • Date Completed:2013-08-01
  • Location: Cameroon
  • Category: Construction