MAVOKO Drinking Water Supply Project

admin/uploads/blog/e7ff96e1a9f760cde11bc6514e749e3d.jpg3be28b5ef27de22fd7f1ea698f0dfffd.jpg
admin/uploads/blog/e7ff96e1a9f760cde11bc6514e749e3d.jpg

MAVOKO Drinking Water Supply Project

KMC Dam:

  • Procurement and installation of 2 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves.
  • Construction of the pump room..
  • Procurement and laying of a 6.2 km HDPE OD 355 raw water main from the intake towards the new water treatment plant Installation of a step-down transformer (11/0.40 kV, 315 kVA).
  • Rehabilitation and cleaning of the existing dam.

 

EAPCC Dam:

  • Procurement and installation of 1 + 1 pumps of 115 m³/h at 115 m, electrical panels, piping and valves.
  • Rehabilitation of the pump room.
  • Procurement and laying of a 3.6 km of HDPE OD 250 raw water main for the raw water backup towards the new water treatment plant.
  • Procurement and installation of a new step-down transformer (11/0.40 kV, 200 kVA).
  • Rehabilitation and cleaning of the existing dam.

 

New Water Treatment Plant:

  • Construction of a 12,000 m³/day drinking water treatment plant.
  • Procurement and installation of the electromechanical equipment (Piping, Valves, Electrical control panels, Dosing equipment and for the preparation of the reagents, Instrumentation, Laboratory equipment).
  • Construction of a 5,000 m³ reinforced concrete ground reservoir incl. procurement and installation of valves and ancillary equipment.
  • Procurement and installation of 1 + 1 pumps (150 m³/h at 75 m), electrical panels, valves, piping and rehabilitation of the pump room (pumping towards DAYSTAR university).
  • Installation of a step-down transformer (11/0.40 kV, 315 kVA).

  • Date Started: 2017-02-01
  • Date Completed:Ongoing Project
  • Location: Kenya
  • Category: Water Supply
  • Tag: Treatment Plant