T5-Zoétélé

admin/uploads/blog/6fddf415fbed9c3c95291dbf99b6c9ec.jpg

T5-Zoétélé

  • Rehabilitation of the intake and the raw water pumping station
  • Rehabilitation of the treatment plant (25 m³/h)
  • Rehabilitation of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  • Rehabilitation of the elevated tank
  • Reinforcement of the electrical line MV/LV and installation of a 100 kVA transformer at the treatment plant
  • Reinstallation of the damaged part of the distribution main.

  • Date Started: 2016-09-01
  • Date Completed:2017-01-01
  • Location: Cameroon
  • Category: Rehabilitation
  • Tag: Reinforcement