  • Rehabilitation of the intake and the raw water pumping station
  • Reinstallation of the treatment units by a new and more efficient containerized unit (20 m³/h)
  • Construction of a technical building
  • Construction of a treated water slab in reinforced concrete
  • Rehabilitation of the treated water pumping station and reinstallation of the hydro-mechanical equipment on the treated water main towards the elevated tank
  • Rehabilitation of the elevated tank
  • Reinforcement of the electrical line MV/LV and installation of a 100 kVA transformer at the treatment plant.

  • Date Started: 2017-03-01
  • Date Completed:2017-11-01
  • Location: Cameroon
  • Category: Construction